Moving Detroit: Signs of Summer – Rising Temps, Flowers and Asphalt – 5/20/13

May 20, 2013

U-Haul Nabisco Building Detroit Broom-Cleaning Lot 02

The signs of summer are all around us at U-Haul Moving and Storage of New Center. Temperatures are rising, flowers are blooming and the asphalt is flowing. Asphalt? Yep. Asphalt, blacktop, flexible concrete. (Sorry, got caught up in a “Beverly Hillbillies” moment.) Asphalt plants here in the East shut down for the winter and start up again in the late spring, when the temperature rises and the ground is no longer frozen. Now that the temperature is up, we’re prepping the parking lot for a facelift.

U-Haul Nabisco Building Detroit Shooting the grade lot_maintenance

The lot’s been broom-cleaned to expose any broken concrete and other areas that may need repair before applying the asphalt. The north half of the lot and the small areal around the handicap ramp look good and will be resurfaced within the next two weeks. The south half of the lot needs repair before the asphalt can be applied. We’ll review proposals this week from asphalt companies on their fix.

HVAC on four means a cool summer inside

U-Haul Nabisco Building Detroit 4th floor HVAC air handler

Climate-controlled storage means keeping the temperature inside warmer in the winter and cooler in the summer. As the weather heat up outside, we’ll be ready. We’re installing the cabling and the duct work for the HVAC system on the fourth floor and the air handler is in place. We’ve also replaced some cracked windows.

The stackable framework is up for the 5×5 lockers. All that’s left is to add the sides and fit the lockers with doors. The crew is finishing some trim work around the floors and the electricians continue to hang the lights and install power supplies and motion sensors

U-Haul Nabisco Building Detroit showroom_menu_board New SignsA 5-Star look in the showroom

The showroom counter area is nearing completion and looks sharp. The power pole has been been to the counter, all electric circuits are in and the pegboard behind the counter is in place. Everything is painted and looking 5-star

More rails and a temporary doorU-Haul Nabisco Building Detroit showroom_menu_board Pegboard

The cart rails have been installed and painted and the door company will be out this week to install a temporary door for the handicapped ramp. This will be temporary and replaced with a glass door.

This blog was created to let the community know that U-Haul is in Detroit, and to share our plans with you and to get input from the community. We want to hear from you. Tell us what you like and don’t like about our posts, building plans or anything else you want to share about Detroit. We are excited to be part of the Detroit community and want to learn from you!

Next post, 5/28. This Memorial Day, say Thank you” to a veteran and their family.

–Pref

More articles like this one…

What’s New

U-Haul Volunteers Serve Dinner at Andre House in Phoenix

U-Haul Volunteers Serve Dinner at Andre House in Phoenix

Seven U-Haul® volunteers shared a portion of their day on April 23 preparing food and then serving dinner to the at-risk and homeless community just south of downtown Phoenix at Andre House. U-Haul partners with many local nonprofits like Andre House, a highly...

Earth Day 2026: At U-Haul, Every Day Is Earth Day

Earth Day 2026: At U-Haul, Every Day Is Earth Day

The 56th annual observation of Earth Day occurs on April 22 with the theme "Our Power, Our Planet." U-Haul proudly celebrates this. But sustainability isn’t a once-a-year talking point for our teams. It’s a business model that predates the modern...

More Than a Race: The Conversations That Define Pat’s Run

More Than a Race: The Conversations That Define Pat’s Run

A firsthand account of Pat’s Run from U-Haul intern and Cronkite School student Peter Bishop. Pat’s Run honors former Army Ranger, NFL standout and Arizona State University alumnus Pat Tillman, who died in 2004, while raising money for the Pat Tillman Foundation — an...