The U-Haul Moving and Storage of New Center building is an impressive building, one that catches the eye immediately. We want the rest of the exterior to measure up, so we’re giving the grounds a facelift. We’ve trimmed the trees and cleared away all of the underbrush.
Looking like a center
The showroom is looking more and more like a real-life U-Haul center. The rest of the menu board signs have been installed, the key-management board has been installed on the back wall and the imaging of the model showrooms is well underway.
Finishing touches
We continue with the finishing touches to the loading/unloading area. The small loading dock has been painted and the first of three new doors has been installed. The second door will be installed this week.
Foxy neighbors
We have some new neighbors. A red fox and her kits have taken up residence on the East side of the building. They’re shy, so the only way we could get photos, was to shoot through a window.
One more inspection passed
The city inspector was in last week and gave his seal of approval to the HVAC and exhaust-fan system in the showroom and to the roof unit.
This blog was created to let the community know that U-Haul is in Detroit, and to share our plans with you and to get input from the community. We want to hear from you. Tell us what you like and don’t like about our posts, building plans or anything else you want to share about Detroit. We are excited to be part of the Detroit community and want to learn from you!
–Pref