We made good progress on the build-out of the self-storage units on the third floor. The frames are in place and doors have been installed in the first row. This week, two...
Migration Trends
U-Haul Stories
In the Community
Media Relations
K&K Concrete Construction
Get Ready Detroit, We’re Floored! – 10/15/12
The big news this week in our revitalization efforts is that the concrete showroom floor has been poured. Read JoeyGirl's vendor profile of K&K Concrete Construction and you...
K&K Concrete Construction Rocks Detroit!
K&K Concrete Construction partners Dan (left) and Kevin. Mission Impossible Showroom Floor! Having to build a showroom floor almost 15 feet above the existing floor sounds...
K&K Concrete Construction Rocks Detroit!
K&K Concrete Construction partners Dan (left) and Kevin. Mission Impossible Showroom Floor! Having to build a showroom floor almost 15 feet above the existing floor sounds...
Sustainable Floor, Awesome Doors, New Sign – 10/01/12
Before I get into this week's update...We've written a lot on our site about U-Haul Company's history and commitment to the adaptive reuse of buildings. We're also all about...