We made good progress on the build-out of the self-storage units on the third floor. The frames are in place and doors have been installed in the first row. This week, two...

In the Community
Media Relations
We made good progress on the build-out of the self-storage units on the third floor. The frames are in place and doors have been installed in the first row. This week, two...
The big news this week in our revitalization efforts is that the concrete showroom floor has been poured. Read JoeyGirl's vendor profile of K&K Concrete Construction and you...
K&K Concrete Construction partners Dan (left) and Kevin. Mission Impossible Showroom Floor! Having to build a showroom floor almost 15 feet above the existing floor sounds...
K&K Concrete Construction partners Dan (left) and Kevin. Mission Impossible Showroom Floor! Having to build a showroom floor almost 15 feet above the existing floor sounds...
Before I get into this week's update...We've written a lot on our site about U-Haul Company's history and commitment to the adaptive reuse of buildings. We're also all about...